Print-Friendly Page

Educational





Bartlett Yancey High School Vocational Building Addition

Project:
Bartlett Yancey High School Vocational Building Addition
Yanceyville, NC
Owner:
Caswell County Schools
Yanceyville, NC
Architect:
Alley, Williams, Carmen, & King, Inc.
Burlington, NC
Scope of Work:
  • New 7,800 square foot classroom wing and welding shop addition.
  • Welding shop includes 14 individual welding stations, cutting torch work area with 6 stations, overhead compressed air, and open floor large-project room.
  • Major funding was provided by Bright Leaf Foundation.
  • >> View Full Project Detail

    Bessemer Elementary School

    Project:
    Bessemer Elementary School
    Greensboro, NC
    Owner:
    Guilford County Schools
    Greensboro, NC
    Architect:
    Pearce Brinkley Cease & Lee
    Raleigh, NC
    Scope of Work:
  • A 12,000 square foot addition and interior renovations as part of Guilford County School Bond Referendum. This construction created 10 new classrooms, and added power, data, new ceilings, and restrooms to the existing building.
  • Site improvements including canopies, walks, and bus turning loop.
  • Project consisted of load bearing masonry walls, steel roof supports, and conventional finishes with extensive casework.
  • >> View Full Project Detail

    Elon Academic Village, Phase II

    Project:
    Elon Academic Village, Phase II
    Elon, NC
    Owner:
    Elon University
    Elon, NC
    Architect:
    Spillman Farmer
    Bethlehem, PA
    Scope of Work:
  • New 10,000 square foot two-story classroom and office facility for the School of Political Science.
  • Finishes including porcelain tile, ceramic tile, extensive moldings and wood trim.
  • Site work that included all utilities and the construction of a fire lane with poly-cell drive covered with sod.
  • >> View Full Project Detail

    Gateway Education Center HVAC Renovations

    Project:
    Gateway Education Center HVAC Renovations
    Greensboro, NC
    Owner:
    Guilford County Schools
    Greensboro, NC
    Architect:
    Triad Engineering Consultants, Inc.
    High Point, NC
    Scope of Work:
  • Complete HVAC Replacement including general construction (replacing ceiling tile with new grid and supports) and electrical work (replacing light fixtures and connecting to existing wiring system).
  • >> View Full Project Detail

    GTCC Drill Tower

    Project:
    GTCC Drill Tower
    Jamestown, NC
    Owner:
    Guilford Technical Community College
    Jamestown, NC
    Architect:
    Stewart Cooper Newell Architects
    Gastonia, NC
    Scope of Work:
  • Construction of a 4-story emergency drill training tower.
  • Construction of an elevator shaft, confined space training apparatus and rappelling wall.
  • Site work that included grading, extension of fire main, and concrete and asphalt paving.
  • >> View Full Project Detail

    Greensboro Technical Community College Science Hall Renovation

    Project:
    Greensboro Technical Community College Science Hall Renovation
    Jamestown, NC
    Owner:
    Guilford Technical Community College
    Jamestown, NC
    Architect:
    TFF Architects & Planners, LLC, Walter Teague
    Greensboro, NC
    Scope of Work:
  • Complete renovation of the three-story 30,000 SF Science Hall including replacement of the HVAC, sprinkler and fire alarm systems, elevator upgrades with associated electrical work and ADA compliant toilet modifations.
  • Exterior work included roof replacement, curtain wall glazing and re-sealing control/expansion joints.
  • Site work limited to providing a back flow preventer and water line for sprinkler system.
  • LEED project with sustainable design requirements.
  • >> View Full Project Detail

    Lindley Elementary School Addition

    Project:
    Lindley Elementary School Addition
    Greensboro, NC
    Owner:
    Guilford County Schools
    Greensboro, NC
    Architect:
    TFF Architects & Planners
    Greensboro, NC 27401
    Scope of Work:
  • A new 14,000 square foot addition consisting of 5 new classrooms.
  • Renovations to the existing Media Center
  • Installation of a new elevator and shaft into the existing three-story building.
  • Exterior work included a new playground, new walking canopies, new bus loop and parking lots.
  • >> View Full Project Detail

    NCSU- Chancellor's Residence Renovation & Addition for the Gregg Museum

    Project:
    NCSU- Chancellor's Residence Renovation & Addition for the Gregg Museum
    Raleigh, NC
    Owner:
    NC State University
    Raleigh, NC
    Architect:
    Perkins + Will
    RTP, NC
    Scope of Work:
  • Remodeling approximately 6,000 SF of a two-story brick residence and basement.
  • Includes a 15,000 SF two-story addition with basement to create and art museum.
  • >> View Full Project Detail

    Norwood Elementary School Media Center Renovation

    Project:
    Norwood Elementary School Media Center Renovation
    Norwood, NC
    Owner:
    Stanly County Schools
    Albemarle, NC
    Architect:
    Pinnacle Architecture, PA
    Matthews, NC
    Scope of Work:
  • Selective demolition and renovation of the 22,300 SF Media Center and classrooms.
  • Renovation includes newly constructed metal stud walls, ceilings, new finishes, lighting, new mechanical system and new electrical.
  • >> View Full Project Detail

    Parkview Elementary School Renovations

    Project:
    Parkview Elementary School Renovations
    Greensboro, NC
    Owner:
    Guilford County Schools
    Greensboro, NC
    Architect:
    The OBSIDIAN Group
    Raleigh, NC 27606
    Scope of Work:
  • Project consisted of a classroom addition with 6 classrooms, 2 resource rooms, a new multi-purpose room, and a media center. Also included were general renovations, accessibility improvements, and technology and HVAC upgrades.
  • >> View Full Project Detail

    Person County Learning Academy

    Project:
    Person County Learning Academy
    Roxboro, NC
    Owner:
    Person County Schools
    Roxboro, NC
    Architect:
    Smith Sinnett Architecture, PA
    Raleigh, NC
    Scope of Work:
  • Related site work consisted of parking lot, demolition of an existing building, driveway improvements, site grading and drainage.
  • Existing metal building was renovated with additional insulation, new windows and door openings, abusive resistant walls, metal studs, floor finish upgrades, and replacement of existing toilet facilities.
  • Masonry veneer panels were added at locations on the façade and new vestibule was added to the existing building.
  • Related site work consisted of parking lot, demolition of an existing building, driveway improvements, site grading and drainage.
  • >> View Full Project Detail

    RCC- Owens Renovation

    Project:
    RCC- Owens Renovation
    Wentworth, NC
    Owner:
    Rockingham Community College
    Wentworth, NC
    Architect:
    Clark Patterson Lee
    Raleigh, NC
    Scope of Work:
  • Three 4,661 SF additions and 34,262 SF interior renovations to existing Owens Building.
  • Convert existing classroom building into simulated healthcare environment for education including- Emergency Department, Nursing Skills Lab, Acute/ICU Lab Ambulance Garage and Surgical Lab.
  • Renovations consist of interior demolition and reconfigured space with new finishes throughout as well as perform renovations to the Lobby.
  • >> View Full Project Detail

    RCC Science Labs Renovation

    Project:
    RCC Science Labs Renovation
    Wentworth, NC
    Owner:
    Rockingham Community College
    Wentworth, NC
    Architect:
    Clark Patterson Lee
    Charlotte, NC
    Scope of Work:
  • Addition and interior renovations to the existing 32,280 SF Science Building constructed in 1966.
  • The 4,902 SF addition includes one Biology Lab and one Chemistry Lab with supporting storage and toilet spaces.
  • Four existing lab renovations totaling 4,676 SF consist of new furniture, equipment repairs and new flooring.
  • >> View Full Project Detail

    Smith High School Physical Education Facility Improvements

    Project:
    Smith High School Physical Education Facility Improvements
    Greensboro, NC
    Owner:
    Guilford County Schools
    Greensboro, NC
    Architect:
    Davis Kane Architects
    Raleigh, NC
    Scope of Work:
  • Includes new construction, new addition, interior renovations and site work.
  • Construction work includes a new free-standing football field house building and an addition onto the existing home grandstand of a varsity locker room and press box structure. Both are load-bearing CMU and brick veneer construction.
  • Interior renovations in the existing main campus building housing the gymnasiums, weight room and locker rooms.
  • Site work includes re-surfacing existing track, re-sodding existing football field and additional fencing around the site.
  • >> View Full Project Detail

    STEM High School Renovations

    Project:
    STEM High School Renovations
    Asheville, NC
    Owner:
    Buncombe County Schools
    Asheville, NC
    Architect:
    N/A
    Scope of Work:
  • Included demolition and complete renovations to 45,000 SF of interior spaces for a new STEM based High School including new classrooms, laboratories, administration offices, restrooms and kitchen.
  • Project design incorporate salvaged steel beams, single-use shipping containers for student Think Tanks, scaffolding, goat fence panels, interior metal roofing, and fall arrest systems.
  • In addition to general construction, project included upgrading the plumbing, sprinkler, HVAC, electrical, fire alarm and data systems.
  • >> View Full Project Detail

    UNC-CH Rosenau Hall Room 133 Renovations

    Project:
    UNC-CH Rosenau Hall Room 133 Renovations
    Chapel Hill, NC
    Owner:
    University of North Carolina at Chapel Hill
    Chapel Hill, NC
    Architect:
    BHDP Architecture
    Raleigh, NC
    Scope of Work:
  • Renovation of approximately 3,200 SF of space in the Rosenau Room of the Gillings Auditorium including demolition, interior finishes, HVAC, electrical, fire alarm and fire sprinkler.
  • >> View Full Project Detail

    Walter Williams High School Classroom Addition

    Project:
    Walter Williams High School Classroom Addition
    Burlington, NC
    Owner:
    Alamance-Burlington School System
    Burlington, NC
    Architect:
    Alley, Williams, Carmen, & King, Inc.
    Burlington, NC
    Scope of Work:
  • New 6,800 SF four-classroom stand alone addition.
  • Site improvement included new paving, sidewalks and fencing.
  • >> View Full Project Detail

    Woodlawn Middle School Renovations

    Project:
    Woodlawn Middle School Renovations
    Burlington, NC
    Owner:
    Alamance-Burlington Board of Education
    Burlington, NC
    Architect:
    Alley, Williams, Carmen & King, Inc.
    Burlington, NC
    Scope of Work:
  • Complete interior renovation and life safety upgrades to the 77,000 SF school including a new media center, administrative offices, computer lab and science labs.
  • Renovations included all new windows and the addition of an elevator.
  • Utilty upgrades included the electrical, mechanical and plumbing systems.
  • >> View Full Project Detail

    Additional Projects
    • Alamance County Community College- HVAC, Stairway & Lighting Repair | Graham, NC
    • NCCU Shepard Library- Renovations | Durham, NC
    • NCSU Ricks Hall- 3rd Floor Renovation & Utilities Upgrade | Raleigh, NC
    • NCSU Tucker Hall- Plumbing Renovations | Raleigh, NC
    • Northeast Middle School-  HVAC Replacement | Greensboro, NC
    • Peeler Elementary School- HVAC Renovations | Greensboro, NC
    • UNC Craige Residence Hall- Elevator Modernization | Chapel Hill, NC
    • UNC-CH Taylor Hall- Fire Safety Improvements | Chapel Hill, NC

    Projects by Industry