Print-Friendly Page

Lincoln Academy HVAC Renovations Part 3





ProjectLincoln Academy HVAC Renovations Part 3
Greensboro, NC
OwnerGuilford County Schools
Greensboro, NC
ArchitectTriad Engineering Consultants, Inc.
High Point, NC
Scope of Work
  • Provide new dedicated rooftop air units and all associated ductwork and air distribution devices.
  • Replace the existing unit ventilators, fan coil units and AHU. New hot water piping distribution will be installed in the crawl space and above first floor ceilings and connected to new unit ventilators, fan coil units and AHU.
  • Replace ceilings and lights to accommodate installation of new ductwork.
  • New equipment will be controlled with an open protocol BacNet DDC controls system that will interface with existing equipment on the campus.

Additional Educational Projects